Project Profiles: Four Briefs and How Each Is Resolved
Most first enquiries fall into one of four shapes. Below is how each is typically resolved, including the constraints that decide the answer. Client names are withheld by agreement, and the figures describe project scope rather than audited results.
1. "I want my own scent, exclusive"
This is an OEM development. The brief is built from reference scents, target market and price ceiling. Development runs 1–3 weeks, then 3–14 days of sampling in the intended grade. Exclusivity is written into the agreement and priced as a development fee, with a committed volume. The constraint is usually volume: an exclusive formula at 5,000 pcs is viable; the same brief at 500 pcs is not, at any manufacturer.
2. "I want 8–12 SKUs for a range, fast"
This is ODM or private label at scale. Profiles are selected from the library of more than 1,000 formulas, grouped by family so the range reads coherently on shelf, then adapted for the target price. The real constraint is component lots: twelve SKUs means twelve bottle-and-pump combinations, and each has to clear its own minimum. Buyers who standardise on one bottle family across the range cut cost and lead time substantially.
3. "I have a bottle design; I need the juice inside it"
This is a filling project. The first question is whether the mould exists. If it does, MOQ holds at 5,000 pcs per SKU and sampling starts in days. If it does not, tooling is quoted, MOQ moves to 5,000 pcs, and the schedule adds weeks. Testing spray, leakage and crimp on the new pack happens before the sample is approved, not after.
4. "I need the lowest possible unit cost"
Three levers, in order of impact: lower concentration (EDC or EDT instead of EDP), a stock bottle rather than a custom one, and a higher order quantity. Each one is a trade-off the buyer has to accept explicitly. A quote that is cheap because the concentration quietly dropped is not a quote — it is a different product, and it will fail at the shelf.
What every project has in common
Approved specification, frozen artwork, and a single clear grade. When those three are fixed before production, the 25–45 day bulk window holds. When any of them moves mid-run, the schedule moves with it.
Describe your brief in one paragraph — market, price, volume, and whether exclusivity matters — and we will tell you which of the four applies: info@oemperfumemanufacturer.com.
Frequently asked questions
What is the minimum order quantity?
5,000 pcs per SKU for all bottle sizes from 5 to 250 ml.
How long do sampling and bulk production take?
Samples in 3-14 days; bulk production 25-45 days after sample approval.
Can the fragrance and packaging be developed to our own design?
Yes. Formula, bottle, cap, pump and folding carton are developed around your artwork, supplied as concentrate or as filled goods.
Which documents come with the shipment?
MSDS, COA and UN-compliant export packaging are provided with every order.













